HVAC Systems: Rightsizing

03/27/2015

The need to provide 100% uptime with a near equivalent reliability in critical facilities does not preclude the opportunity to reduce first cost and improve efficiency by avoiding inefficient oversizing of mechanical equipment. Providing redundant capacity and sizing for true peak loads can be done in a manner that improves overall system efficiency, but only if a system design approach is used that considers efficiency among the design parameters.

Technologies: